The Challenge

UCLA Spieker Aquatic Center sought construction of a new, state-of-the-art outdoor competition pool facility to serve the world class UCLA swim teams. ADG was engaged to:

  • Install moveable bulkheads for pool length customization.
  • Provide support systems for competition and training.

The Solution

ADG manufactured and installed a Whitten® stainless steel moveable bulkhead which provided the ability to create various course lengths in the 52-meter by 25-yard all-deep pool to be utilized for competitive swimming, training and water polo activities. Additionally, a Whitten® SoftEntry air sparger system was provided to support competition diving and training activities for the UCLA swim teams.

The Result

Since completion, the facility has proven a complete success providing UCLA and its award-winning swimming and diving teams with a state-of-the-art training and competition venue.

 

Download the Case Study here>>>

Aquatic Development Group